Single plantwide factory overhead rate California Chrome Company manufactures three chrome-plated products?automobile bumpers, valve covers, and wheels. These products are manufactured in two production departments (Stamping and Plating). The factory overhead for California Chrome is $338,400. The three products consume both machine hours and direct labor hours in the two production departments as follows: 1. Determine the single plantwide factory overhead rate, using each of the following allocation bases: (a) direct labor hours and (b) machine hours. Direct labor overhead rate $ per direct labor hour Machine hour overhead rate $ per machine hour 2. Determine the product factory overhead costs, using (a) the direct labor hour plantwide factory overhead rate and (b) the machine hour plantwide factory overhead rate. Automobile Bumpers Valve Covers Wheels Direct labor hours $ $ $ Machine hours $ $ $