Details of this Paper

"I need help with this class. I am currently deplo...

Description

Solution


Question

"I need help with this class. I am currently deployed and work long hours. I need help catching up my assignments. I have attached my document that I started below. Please help. I am including the project information below: ******************************************************* Assignment: Select one of the three RFP procurements cases listed below (A New Practice Field, An Environment Impact Study, and an Inventory Control System) for your Course Project. Use the RFP template located in the Doc Sharing area to complete the cover page and the following sections of the RFP (1.1, 1.2, 1.3, and 1.4). Resources: Obviously, Chapters 1 through 6 of the text would serve as a starting point. Please be advised that considerable relevant material is also available on the Internet, so you might want to conduct a search for some materials that may yield insights into the RFP development process. Download and use the RFP template from the Doc Sharing area. Procedures and Deadline: All project issues should be directed in the Q & A forum or addressed in class. The PP1 RFP should be prepared in a MS Word format suitable for electronic transmission. Any resources used beyond the textbook need to be cited in your document?INCLUDING links to relevant websites. Be sure to include footnotes and bibliography. Submission Details: All PP1 documents must be submitted no later than the end of Week 2. There will be a penalty for late submissions. Submit a soft copy of your RFP in the Dropbox created for this purpose. Clarification on Assignment: All questions of a clarification nature should be asked in the weekly Q & A forum discussion topic. Grading: Eighty percent of points will be for content (including proper use of the English language) and 20 points will be based following the instructions for the assignment. RFP Content: Your RFP should utilize the best practices of the Pre Award Phase that apply to your project. You must choose the type of contract that you feel is most appropriate for this procurement. I will set the length limit at three double-spaced pages (12-point font) for the main body of the RFP (sections 1.1 ? 1.4). (Please do not feel obligated to reach that limit.) All other section content should be noted as to-be-determined (tbd). The first page of your overall submission must be a cover sheet that contains the project title (hopefully, not ?PP1? or anything like that?be inventive), your name, your e-mail address, and course identifying information (e.g., ?PM598 for this term? will suffice?obviously, use the correct term identifier). The second page will be a Table of Contents (TOC) listing the major RFP sections together with page numbers. Include on this page a listing of the references that you used in the RFP preparation, including websites, if any. The next one to three pages constitutes the main body of the RFP. Appendix B contains a list of suppliers to whom you would send the RFP. These must be real bona-fide contractors?not hypothetical ones. On that page, say how you chose these potential suppliers. The cover sheet, TOC/references page, and supplier list do not count toward the three-page limitation. RFP Procurement Cases Select one of the following RFP procurement cases to develop your PP1 RFP: An Inventory Control System You sell seeds from a catalog, and business has been blossoming. However, your inventory tracking system is inadequate. In high season, supply outages have been frequent, and customer complaints over delays have been increasing. You fear that your business will die on the vine unless something is done to improve things. You want to hire a management consultant to design a new inventory tracking system. This kind of work normally requires about six months' worth of effort. It is now May. You need to issue an RFP for this work. The procurement will be for the design stage only?implementation may or may not be handled under a separate contract at a later date. Assignment: Project Part Two (PP2) entails completing the remaining sections of the Request for Proposal (RFP) that was selected and prepared for Project Part One (PP1). Background: The project directly addresses TCO E and covers material in Chapters 1 through 8 of the text. These chapters develop the procurement process up to the point of issuing the RFP. The remaining chapters of the book consider procurement activities undertaken subsequent to this milestone RFP event. Part 3 (PP3) will deal with material from a wider range of the Garrett text. Terminal Course Objectives (TCOs): The following TCOs are addressed in the PP2 assignment: TCO A: Given a project situation, discuss and document the six phases of the procurement cycle and the impact each procurement has on the overall project. TCO B: Given a project situation, analyze the factors that are important when qualifying and selecting suppliers for a project requirement. TCO C: Given a project situation for a major contract, examine the key factors, including risk factors that affect buyer and supplier decisions concerning contract pricing and the selection of the proper contract type. TCO D: Given a procurement situation for a major contract, analyze the application of e-Procurement and other types of supplier bidding models available. TCO E: Given a situation to solicit a bid proposal, evaluate technical, management, commercial, and ethical requirements, and then prepare a Request for Proposal (RFP). Resources: Obviously, Chapters 1 through 8 of the text would serve as a starting point. Please be advised that considerable relevant material is also available on the Internet, so you might want to conduct a search for materials that may yield insights into the RFP development process. Use the RFP template from your PP1 assignment, which was downloaded from the DocSharing area. Procedures and Deadline: All project issues should be directed in the Q & A forum or addressed in class. The PP2 RFP should be prepared in a MS Word format suitable for electronic transmission. Any resources used beyond the textbook need to be cited in your document?INCLUDING links to relevant websites. Be sure to include footnotes and bibliography. Submission Details: All PP2 documents must be submitted no later than the end of Week 4. Submit a copy of your RFP in the Dropbox created for this purpose. Clarification on Assignment: All questions of a clarification nature should be asked in the weekly Q & A forum discussion topic. Grading: Eighty percent of points will be for content (including proper use of the English language) and 20 points will be based following the instructions for the assignment. RFP Content: Your RFP should utilize the best practices of the Pre Award Phase that apply to your project. You must choose the type of contract that you feel is most appropriate for this procurement. I will set the length limit at 10 double-spaced pages (12-point font) for the main body of the RFP. (Please do not feel obligated to reach that limit.) You may attach additional appendices if you wish, but these must be limited to clarifying material that has been borrowed from elsewhere or developed as an exhibit. "

 

Paper#14055 | Written in 18-Jul-2015

Price : $25
SiteLock