It is not possible to be in control on the X-bar chart and out of control on the R-chart

Description

solution


Question

1) It is not possible to be in control on the X-bar chart and out of control on the R-chart for the same process at the same time;True ______ False;2) Nonrandom variation can be the result of an operator error.;True _____ False;2) A project manager at System Design Corporation has collected the following data on the size of software programs and the length of programming time. The company is bidding on a new system that is estimated to consist of 25000 lines of code. Please use the data to find the functional relationship of the coding time to the program size and estimate the number of days it would take to code the system.;Module Size in 1000 lines of code (KLOC) Number of days to code;1 160 68;2 158 66;3 148 70;4 135 59;5 178 72;6 170 68;7 158 64;8 138 65;9 200 70;10 195 68;11 189 65;12 173 68;13 159 70;14 163 71;15 150 66;16 140 65;17 206 73;18 144 64;19 157 70;20 183 74;21 195 75;22 190 77;23 182 69;24 152 65;25 174 69;3) For the above problem plot a histogram of module size in this program.;4) Consider a machine that fills soda bottles. The process has a mean of 15.9 ounces and a standard deviation of 0.06 ounces.;The specification limits are set between 15.8 and 16.2 ounces.;a) Compute and interpret the machine?s Cp;b) Compute and interpret the machine Cpk;c) What % of the bottles will be considered under-filled?

 

Paper#20318 | Written in 18-Jul-2015

Price : $41
SiteLock