Details of this Paper

devry bsop206 week 6 quiz




1. Question: (TCO 3) Which one of the following is a benefit of the implementation of JIT?;increased cost;overproduction;increased delays in production time;quality improvement;Question 2. Question: (TCO 3) In the just-in-time framework, waste is;steps that add value.;necessary to the elimination of variability.;the natural by-product of a push system;anything that does not add value;Question 3. Question: (TCO 3) Which of the following is a goal of JIT partnerships?;reduce inventory and variability;increase variability;increase in-transit inventory;elimination of engineering changes;Question 4. Question: (TCO 3) Which of the following is not a benefit of small production lots?;work-in-process inventory is smaller;holding costs decrease;workstations can be placed closer together;manufacturing cycle time is longer;Question 5. Question: (TCO 3) Level schedules;requires that schedules be met with variation;process many small batches rather than one large one;is known as "kidney bean" scheduling;all of the above are true regarding level scheduling;Question 6. Question: (TCO 12) The typical time horizon for aggregate planning is;less than a month;up to three months;three to 18 months;over one year;over five years;Question 7. Question: (TCO 12) The planning tasks not associated with staffing, production, inventory, and sub-contracting levels typically fall under;short-range plans;strategic planning;long-range plans;demand options;none of the above;Question 8. Question: (TCO 12) Aggregate planning is prepared;directly from the short-term scheduling;directly from the capacity plans;from work center loading up;from master schedules;from the dispatch plans;Question 9. Question: (TCO 12) Which of the following aggregate planning strategies is not a "capacity option"?;influencing demand by changing price;absorb change in demand during the planning period;modify the workforce to absorb fluctuations;changes due to varying size of the workforce;all of the above are capacity options;Question 10. Question: (TCO 12) Which of the following is the term used for medium range capacity planning with a time horizon of three to 18 months?;material requirements planning;short-range planning;strategic planning;aggregate planning;Page: 1 2;Question 1. Question: (TCO 3) Match the following terms with their correct definition.;Comments;Question 2. Question: (TCO 3) Define the linkage of continuous improvement and TPS.;Question 3. Question: (TCO 3) Identify three ways in which JIT contributes to a competitive advantage?;Question 4. Question: (TCO 3) What are three ways in which JIT and the Cost of Quality are related?;Question 5. Question: (TCO 12) What is level-scheduling and what does it do?;Question 6. Question: (TCO 12) What makes short-term scheduling of strategic importance?;Question 7. Question: (TCO 12) What is aggregate planning, and what is its key objective?


Paper#30092 | Written in 18-Jul-2015

Price : $41