Details of this Paper

strayer BUS430 QUIZ 5




? Question 1;3 out of 3 points;Which type of layout is best for high volumes of demand with few if any setups/changeovers?;Answer;? Question 2;3 out of 3 points;Which of the following is not a common approach for designing process layouts?;Answer;? Question 3;3 out of 3 points;All of the following are common objectives of layout studies except;Answer;? Question 4;3 out of 3 points;Which of the following is not a disadvantage of virtual teams?;Answer;? Question 5;3 out of 3 points;For a given cycle time in line balancing, assembly-line efficiency can be increased by;Answer;? Question 6;3 out of 3 points;All of the following are limitations to process layout except;Answer;? Question 7;3 out of 3 points;Considering ergonomics, which of the following does not fit?;Answer;? Question 8;3 out of 3 points;The production of large goods such as airplanes is best accomplished using a ____ layout.;Answer;? Question 9;3 out of 3 points;is vertical expansion of job duties to give the worker more responsibility.;Answer;? Question 10;3 out of 3 points;The typical layout of facilities in a hospital would be an example of a ____ layout.;Answer;? Question 11;3 out of 3 points;The determination of specific job tasks and responsibilities is called ____.;Answer;? Question 12;3 out of 3 points;An assembly line with 28 activities is to be balanced. The total amount of time required for all 28 activities is 39 minutes. The line will operate for 450 minutes per day. What must the cycle time be to achieve an output rate of 400 units/day?;Answer;? Question 13;3 out of 3 points;A(n) ____ performs entire jobs rather than specialized, assembly line work.;Answer;? Question 14;3 out of 3 points;A ____ layout is an arrangement based on self-contained groups of equipment needed to produce a particular set of goods or services.;Answer;? Question 15;3 out of 3 points;classifies parts into families so that cellular layouts can be effectively used.;Answer;? Question 16;3 out of 3 points;Which one of the following is not directly related to a supply chain?;Answer;? Question 17;3 out of 3 points;The weights typically used in the center-of-gravity method are;Answer;? Question 18;3 out of 3 points;A contract manufacturer can offer significant competitive advantages. Which one of the following is not an advantage of using a contract manufacturer.;Answer;? Question 19;3 out of 3 points;Factors such as managers' preferences, services and taxes, available transportation systems, banking services and environmental impacts would be most closely related to which level of the facility location hierarchy?;Answer;? Question 20;3 out of 3 points;A pull system;Answer;? Question 21;3 out of 3 points;All of the following are considered non-economic factors in location decisions except;Answer;? Question 22;3 out of 3 points;The metric "perfect order fulfillment" is often used to measure ____.;Answer;? Question 23;3 out of 3 points;The point in the supply chain that separates the push system from the pull system is called the;Answer;? Question 24;3 out of 3 points;Managing the flow of goods and materials from the customer backward through the supply chain is called;Answer;? Question 25;3 out of 3 points;A(n) ____ produces goods in advance of customer demand using a forecast of sales and moves them to points of sale where they are stored as finished goods inventory.;Answer;? Question 26;3 out of 3 points;A firm that specializes in certain types of goods-producing activities, such as customized design, manufacturing, assembly, and packaging, and works for end users is called a ____.;Answer;? Question 27;3 out of 3 points;Where in its supply chain does Dell, Inc. begin to use a pull system?;Answer;? Question 28;3 out of 3 points;For General Motors' supply chain, the ____ is the push-pull boundary.;Answer;? Question 29;3 out of 3 points;A(n) ____ produces only what is needed at upstream stages in the supply chain in response to customer demand signals.;Answer;? Question 30;3 out of 3 points;is the process of delaying product customization until the product is closer to the customer at the end of a supply chain.;Answer


Paper#30307 | Written in 18-Jul-2015

Price : $46