Details of this Paper

10 A bank manager wants to determine the percent of time that tellers

Description

solution


Question

10 A bank manager wants to determine the percent of time that tellers are working and idle. She decides to use work sampling, and her initial estimate is that the tellers are idle 30 percent of the time. How many observations should the manager take in order to be 95 percent confident that the results will not be more than 2.5 percent away from the true result?;11 Decision Science Institute (DSI) promotes its annual national conference by mailing thousands of letters to various recipients. A time study has been conducted on the task of preparing the letters for mailing. On the basis of the observations below, DSI wants to develop a time standard for the task.;The organization?s personal, delay, and fatigue allowance factor is 15 percent. Compute the average cycle time and normal time for each element. Then, calculate the standard time for the entire task.;CYCLE OBSERVED IN MINUTES;JOB ELEMENT 1 2 3 4 5 PERFORMANCE RATING;(A) Compose letter 8 10 9 11 11 120%;(B) Print address labels 2 3 2 1 3 105%;(C) Stuff, seal, and sort envelopes 2 1 3 2 1 110%;Attachment Preview;Work Measurement Problem Set.doc;10 A bank manager wants to determine the percent of time that tellers are working and;idle. She decides to use work sampling, and her initial estimate is that the tellers are idle;30 percent of the time. How many observations should the manager take in order to be 95;percent confident that the results will not be more than 2.5 percent away from the true;result?;11 Decision Science Institute (DSI) promotes its annual national conference by mailing;thousands of letters to various recipients. A time study has been conducted on the task of;preparing the letters for mailing. On the basis of the observations below, DSI wants to;develop a time standard for the task.;The organizations personal, delay, and fatigue allowance factor is 15 percent. Compute;the average cycle time and normal time for each element. Then, calculate the standard;time for the entire task.;CYCLE OBSERVED IN MINUTES;JOB ELEMENT;(A) Compose letter;(B) Print address labels;(C) Stuff, seal, and sort envelopes;1;8;2;2;2;10;3;1;345;9 11 11;213;321;PERFORMANCE RATING;120%;105%;110%

 

Paper#34661 | Written in 18-Jul-2015

Price : $37
SiteLock