Details of this Paper

Devry ACCT434 Week 7 quiz

Description

solution


Question

Question;QuizQuestion 1.1.(TCO 11)The four cost categories in a cost of quality program are(Points: 3) product design, process design, internalsuccess, and external success.prevention, appraisal, internal failure, andexternal failure.design, conformance, control, andprocess.design, process specification, on-timedelivery, and customer satisfaction.Question 2.2.(TCO 11) ________ is a formal means ofdistinguishing between random and nonrandom variation in an operatingprocess.(Points: 3) Statisticalprocess control (SPC)A ParetodiagramA cause-and-effectdiagramA fishbonediagramQuestion 3.3.(TCO 11) Which of the following is NOT one of the three mainmeasurements in the theory of constraints?(Points: 3) Investmentsor inventoryOtheroperating costsManufacturinglead timeThroughputcontributionQuestion 4.4.(TCO 11)A liability claim is an example of(Points: 3) externalfailure costs.internalfailure costs.preventioncosts.appraisalcosts.Question 5.5.(TCO 11) Regal Products has a budget of $900,000 in 20X3 for prevention costs. If it decides to automate a portion of its prevention activities, it will save $60,000 in variable costs. The new method will require $18,000 in training costs and $120,000 in annual equipment costs. Management iswilling to adjust the budget for an amount up to the cost of the new equipment. The budgeted production level is 150,000 units. Appraisal costs for the year are budgeted at $600,000. The new prevention procedures will save appraisal costs of $30,000. Internal failure costs average $15 per failed unit of finished goods. The internal failure rate is expected to be 3%of all completed items. The proposed changes will cut the internal failure rate by one-third. Internal failure units are destroyed. External failure costs average $54 per failed unit. The company's average external failuresaverage 3% of units sold. The new proposal will reduce this rate by 50%. Assume all units produced are sold and there are no ending inventories. How much will appraisal costs change assuming the new prevention methods reduce material failures by 40% in the appraisal phase?(Points: 3) $60,000increase$12,000decrease$30,000decrease$240,000decreaseQuestion 6.6.(TCO 12) The amount of time between when a customer places an order for a product or requests a service to when the product or service isdelivered to that customer is called(Points: 3) customer-responsetime.orderreceipt time.orderdelivery time.manufacturinglead time.Question 7.7.(TCO 12)Quality costs include(Points: 3) preventioncosts.stockoutcosts.purchasingcosts.orderingcosts.Question 8.8.(TCO 12) Which of the following statements about theeconomic-order-quantity decision model is FALSE?(Points: 3) It assumes ordering costs and carryingcosts are relevant.It assumes stockout costs are irrelevantif no stockouts occur.It assumes purchasing costs are relevantwhen the cost per unit changes due to the quantity ordered.It assumes quality costs are irrelevant ifquality is unaffected by the number of units purchased.Question 9.9.(TCO 12) When using a vendor-managed inventory system to enhance thefeatures of supply-chain management, a challenging issue is(Points: 3) problemsof communication and trust.the sharing of accurate, timely, andrelevant information about sales forecasts.potentially incompatible informationsystems.Allof the aboveQuestion 10.10.(TCO 12) Liberty Celebrations, Inc., manufactures a line of flags. The annual demand for its flag display is estimated to be 100,000 units. The annual cost of carrying one unit in inventory is $1.60, and the cost to initiate a production run is $40. There are no flag displays on hand butLiberty had scheduled 60 equal production runs of the display sets for the coming year, the first of which is to be run immediately. Liberty Celebrations has 250 business days per year. Assume that sales occur uniformly throughout the year and that production is instantaneous.If Liberty Celebrations does not maintain a safety stock, the estimated total carrying cost for the flag displays for the coming year is(Points: 3) $2,000.$2,200.$2,400.$3,000.

 

Paper#38420 | Written in 18-Jul-2015

Price : $19
SiteLock