Details of this Paper

Devry MGMT404 week 2 ilab

Description

solution


Question

Question;Devry MGMT404 week 2 ilabDevry MGMT404 week 2 ilabOnce the base schedule has been created, resources can be assigned to tasks. To complete that this week, we will:Create a list of resources. Assign resources to tasks. Assign costs to resources. Use resource information to determine a preliminary cost for the project. GuidelinesComplete Lesson 2.A printout of your Table: Entry showing all columns, but no Gantt chartA printout of your Table: Cost showing all columns but no Gantt chartPrint the SummaryReport.Print the Budget Report.Print the Who Does What report.Print the Overallocated Resourcesreport.DeliverablesAll of the following deliverables are required (in a zip file) to receive full credit:Completed MyLab2_XXX.mppCompleted Review QuestionsPrintouts/Screenshots contained in Week_2_Printouts_XXX.docx When submitting required printouts, if you are not bringing them to class, from the Print Preview Page, take a screen shot (in Windows) of the report and paste the screen shot to a MS Word Document. Make sure to crop the screen to show only the report. After cropping, resize the image appropriately. If the printout is on more than one page, paste each page individually.Save the Word document containing printouts as Week_2_Printouts_XXX.docx, and submit this file to the Week 2 iLab Dropbox in a zip file along with the MyLab2_XXX.mpp file and the completed Review Questions at the end of Lesson 2. Remember to replace "XXX" in the file names with your initials, and ensure that all of your files are all clearly labeled and include your initials in the file name.Grading RubricEach week, you will be using Microsoft Project to build and manage a project plan similar to what you would use or see outside of the classroom, in your workplace. As noted in the Syllabus, these MS Project files are worth 40 points each week. Remember that from the file you submit each week, points will be deducted for incorrect answers.CriteriaPoints%All required components are accurately completed. MS Project file is accurate, Review Questions are correct, and printouts are acceptable for management communication (all columns are wide enough to be read, headers are correct to the requirements stated in Week 7 iLab).40100%The assignment file contains all of the required components. The work is mostly accurate and the printouts are completed. Printouts are readable, but the formatting is not acceptable for management communication. 30-3975-97%The assignment file contains most of the required components. The work is completed with a fair degree of accuracy.20-2950-72%The assignment file contains some of the work. Accuracy is lacking.1-201-50%No iLab work is submitted.00%iLAB STEPSSTEP 1: Download iLab InstructionsBack to TopClick the links below to access this week's iLab instructions.MS Project Lesson2.docx (Review Questions to be completed and submitted for Lesson 2 are located at the end of this document.)STEP 2: Complete the iLab AssignmentBack to TopComplete the iLab assignment for Week 2 based on the Guidelines section and Lesson document above.STEP 3: Submit iLab DeliverablesBack to TopCreate a folder called MGMT404_YourLastName_Lab2.Place copies of each required deliverable into this folder.Right-click on the folder and select Send To? Compressed (zipped) Folder. You can also use other tools to compress the files into a single zip folder, (e.g., 7-zip).Upload the zip file to the weekly iLab Dropbox in eCollege.

 

Paper#46010 | Written in 18-Jul-2015

Price : $62
SiteLock