Details of this Paper

strayer BUS430 quiz 10

Description

solution


Question

Question;? Question;1;3 out of 3 points;Southwest Airlines illustrates;the application of "lean principles" when it;? Question;2;3 out of 3 points;Which of the following is least;related to a pull system?;? Question;3;3 out of 3 points;Total Production Maintenance;(TPM);? Question;4;3 out of 3 points;Ford Motor Company has decided to;switch to a pull system of manufacturing and distribution for its vehicles.;Which one of the following is most likely to occur?;? Question;5;3 out of 3 points;Principles of lean operating;systems include all of the following except;? Question;6;3 out of 3 points;According to the Toyota Motor;Company, which of the following is not one of the seven major waste categories?;? Question;7;3 out of 3 points;Quality at the source requires;? Question;8;3 out of 3 points;A withdrawal Kanban;? Question;9;3 out of 3 points;Toyota classified waste into;seven major categories. Those categories;include all of the following except;? Question;10;3 out of 3 points;In the 5Ss, items identified as;unnecessary and thus removed from a workplace would be included with which S?;? Question;11;3 out of 3 points;Which of the following is least;related to a push system?;? Question;12;3 out of 3 points;Quick setup or changeover of;tooling and fixtures is associated with ____.;? Question;13;3 out of 3 points;The number of Kanban cards is;dependent on all of the following except;? Question;14;3 out of 3 points;Long lead-times and higher;work-in-process is most closely related to which of Toyota's "Seven Major;Waste Categories?;? Question;15;3 out of 3 points;Which of the following is not a;basic principle of a lean operating system?;? Question;16;3 out of 3 points;Which step in the project;management process would involve developing alternative plans in anticipation;of problems that might arise?;? Question;17;3 out of 3 points;Which of the following is least;related to Program Evaluation and Review Technique (PERT)?;? Question;18;3 out of 3 points;A type of organization which;loans" resources to projects while still maintaining control over;them is called;? Question;19;3 out of 3 points;Which step in the project;management process would involve determining time estimates for activities?;? Question;20;3 out of 3 points;In which stage in the project;life cycle would critical path calculations be performed?;? Question;21;3 out of 3 points;In which stage in the project;life cycle would a Gantt chart be used?;? Question;22;3 out of 3 points;The county government has decided;to redo the street you live on and plans to block the street off which causes;you and your neighbor's considerable inconvenience. The project has three;parallel paths defined as follows: (i) path A-B-C-H to install street lights;and electrical wiring that takes 16 days, (ii) path A-D-E-H to install;sidewalks with handicap capabilities that takes 22 days, and (iii) path A-F-G-H;to repave the street including storm drains that takes 30 days. Which one of;the following statements is true?.;? Question;23;3 out of 3 points;Which is incorrect regarding the;critical path?;? Question;24;3 out of 3 points;Which of the following is not;considered a project?;? Question;25;3 out of 3 points;Which statement is true regarding;activities not on the critical path?;? Question;26;3 out of 3 points;Which of the following is not a;stage in the project life cycle?;? Question;27;3 out of 3 points;A project has three paths. A-B-C;has a length of 25 days. A-D-C has a length of 15 days. Finally, A-E-C has a;length of 20 days. Which one of the following statements is true?;? Question;28;3 out of 3 points;Which of the following is not an;assumption of the critical path method?;? Question;29;3 out of 3 points;In which stage in the project;life cycle would crashing likely be performed?;? Question;30;3 out of 3 points;Which of the following is;incorrect regarding time/cost trade-offs?

 

Paper#52683 | Written in 18-Jul-2015

Price : $32
SiteLock