Details of this Paper

BOS 3525 - Unit VIII Case Study Scenarios




Question;Unit VIII Case Study ScenariosSCENARIO # 1: An Unannounced InspectionThe Situation: An OSHA inspector arrives at your worksite requesting to talk with you about aninspection based on the health and safety complaints of a worker. You are in your office and theOSHA inspector is at the reception office. You know this worker to be a highly disgruntledindividual who is constantly questioning all aspects of his job and the work environment. Thearea he works in is currently undergoing a major renovation for a process change for theproduct in the line, but it is still trying to produce the older version of the product at a lowervolume than before. Your area supervisor is a competent individual, but they are working undera lot of stress with the changeover, therefore, you are only 80% sure that the claims listed in thecomplaint are groundless and without merit. The worker is also heavily involved in an effort tounionize the plant employees. In addition, your plant manager is in another state at corporateheadquarters for some important meetings.The Questions: How would you act, what actions should you take, and what would you do?Should you challenge the validity of the OSHA inspector's request, or their right to enter theworkplace? Or should you request a warrant to enter the workplace, and thereby gain sometime to make sure everything is in order back in the plant? Can you gain any time to check withyour in-area safety supervisor first? Or, should you immediately comply with the request for theinspection? Explain your answers.SCENARIO # 2: Serious Near-Miss Crane IncidentThe Situation: You are the EH&S professional at your company's shipyard. You have justreceived a call from a production supervisor that there has been a very serious near missaccident out in the assembly area. Your company is manufacturing the second Littoral CombatShip (LCS) for the US Navy. This new generation high speed, trimaran design warship has been designed to carry out a wide range of tactical, combat, and support operations in the near-shore(littoral) environment. The project is severally over budget and has received a considerableamount of criticism for it. Successful completion of the project at this phase will be a primedeterminant in your companies securing the very lucrative follow-up contracts for more LCS's.Everyone in the shipyard feels the pressure to complete this project ASAP.Apparently a very large 20 ton overhead crane had some cables snap and has partiallycollapsed while trying to hoist a large section of the vessel into place for its final weldingoperation. When you arrive on scene, you see the section wedged overhead between somesupport beams and walkways. About a dozen hourly workers are scattered about as they leapedto safety after hearing the cables snap. There are many bumps, bruises and scratches on theworkers, but they all are able to be treated internally at your nurse's office. In this initialassessment, there appears to be no need for, or request on the part of the employees, to go toany outside medical consultant or hospital emergency room.Almost immediately you can hear the men complaining that the first attempt to lift the unit didnot work and then the production engineer's decided to jury rig some extra cables to lift theunit in place. In addition, one individual said that they were trying to hoist about 28-30 tons, andthat was just too much for the old crane. Another offered that the cables themselves had notbeen changed out in a couple of years and that was against OSHA regulations. Everyone saidthat they could hear the unit groan and screech before the cables snapped and the cranepartially collapsed.Before you walk off with the supervisors to inspect the damage one of the workers offers theopinion that this is an imminent danger situation. About 30 minutes later, you are meeting withthe engineers and supervisors on one the overhead platforms continuing your inspection of thedamage: when a supervisor comes up and tells you that he has heard that an hourly employee has just called OSHA and told them of the situation and that they used the term imminent danger in their conversation.The Questions: What are your most important concerns? What should you do next? Whatinformation is the most critical for you to have right away? What directions would you give to thesupervisors and engineers? When should you inform your facility manager and what should youtell him/her? Should you meet with the hourly employees and what will you discuss with them?How will you handle the OSHA inspector should one show up in the next few hours?Instructions: For Scenario # 1 AND # 2, you are required to discuss a sequential Action Plan onyour part that addresses all of the issues presented. It should be a minimum of about 500-600words (that's about two pages when double spaced, 12 pt type, 1 margins) and must follow theAPA formatting guidelines.


Paper#58887 | Written in 18-Jul-2015

Price : $29