Details of this Paper

Implementing a cluster for a mission critical Environment




Develop and submit a project plan including implementation steps for the configuration and implementation of a cluster computing solution to support a mission critical application.;In a project of 4?5 pages, complete the following;How the model that you have selected will minimize downtime and increase performance.;Your discussion should include hardware to be used and the implementation strategy you will follow to reduce the single points of failure.;Identify storage connectivity types (Fiber or Ethernet).;Will your implementation leverage shared storage?;How have you configured each node to mitigate your risk of having a single point of failure (multiple NIC, HBA cards, internal HD, etc.)?;Are your node located in same data center, multiple cities etc., and why?;Create a diagram of your cluster implementation. The diagram should depict the following;All nodes of the cluster;LAN connection;Storage connection points and all redundant connections;IP addressing schemes for public and private network connections;Submit 1 project plan per group.


Paper#67907 | Written in 18-Jul-2015

Price : $37