Question

Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).;? Ensure the main WBS tasks headings are the 5 PMBOK? process areas (Initiating, Planning, Executing, Monitoring& Controlling and Closing);? Create a Work Breakdown Structure Code for each task. (as seen in above example);? Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.;? Create accurate work package assumptions and duration estimates.;? Include 7 resources assigned in the Resource Sheet as ?Work? types and 3 resources assigned as ? Material? types.;? Ensure the Resources are paid no more than $30/hour and that the ?Material? cost per use will not exceed $50.;? Include your resources and materials from the Resource Sheet in the task sheet.;? Create 10 dependencies in the Task Sheet

 