Manufacturing cost data for Orlando Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. Case A Case B Case C Direct materials used $ (a) $91,800 $68,000 Direct labor 60,100 143,100 (h) Manufacturing overhead applied 50,484 (d) (i) Total manufacturing costs 153,700 (e) 216,500 Work in process 1/1/14 (b) 19,200 18,400 Total cost of work in process 212,300 (f) (j) Work in process 12/31/14 (c) 13,400 (k) Cost of goods manufactured 197,100 (g) 228,900

 